I know that is an optimistic title for a post, but it feels like we are getting there. Hopefully the leaking sump joints are sealed, and we can get on with it!  Here are the latest pics:

You can see my beautiful brick path – good thermal mass to help with moderating the polytunnel temperatures, and much nicer to walk on than the mud! The large buried sump at the back has a timber deck covering it that the kids can stand on to reach the back beds – so I think those will now be their spot for planting.

And here’s the right hand side:

The timber “paving” is over the new link between the two shallow sumps – designed so that I can lift it up to check for leaks.

Now it’s all “cycling” again – building up the bacteria that’ll clean the water. Soon I’ll start planting – but in the meantime we have our first Aquaponics workshop on next week, so time to tidy up!

Advertisements